Assembled within a wood made conventional crane access was very difficult hence our first task was to assemble the floor structure over the pile caps. Once completed we built a mobile scaffold on rails and starting from the far end we worked back using a Hiab for lifting. Each arch section was assembled flat and then moved down the length of the building and lifting into place.