St. Edwards School Library
St. Edwards School Library The Green Oak Carpentry Company collaborated with TSH during the technical design phase to contribute to the Glulam Frame's design and specifications. Nigel Challis from AWA…
St. Edwards School Library The Green Oak Carpentry Company collaborated with TSH during the technical design phase to contribute to the Glulam Frame's design and specifications. Nigel Challis from AWA…
Flimwell The construction of these timber buildings was experimental. The brief was to try to build in timber for the same cost as a steel portal frame, but without compromising…
Windmill Hill Farm Completed in 2012, this structure features a stress skin diagrid crafted from 300 x 70 oak glulam beams with crown cut oak veneers, forming innovative planar trusses…
The Lookout Architect: David Morely Architects Builder: Fairhust Ward Abbott Three sets of 22-meter primary roof beams are supported by tree assemblies and interconnected within the roof structure to prevent…
Hall Grove School – Early Years Building Also referred to as the 'Great Barn', this structure, completed in 2016 for Hall Grove School, serves as their new early years facility.…
Aldenham School The recently erected structure has enriched the school's musical curriculum by providing exceptional rehearsal rooms and performance areas, attesting to the school's strong focus on music education. Overcoming…